Design
ARRANGEMENT PLAN
- POST location selection according to insulation panel layout
- Securing traffic through side opening
- Securing space for installing pump tower and operating elevator
- Consulting on installation and dismantling according to customer's shipbuilding method
STRENGTH CALCULATION
- Verification that the criteria required by the GTT guidelines are met
- Load Case Analysis according to installation equipment operation, material stacking, and work
- Load Case Analysis according to each leg length adjustment
3D MODEL
- Create 3D MODEL according to actual specifications
- Perform interference check and eliminate assembly impossibility risk in advance
- Calculate Weight and COG and utilize as Lifting Data
ASSEMBLY & DISMANTLE DRAWING
- Part location, number and quantity notation for each assembly step
- Dimensions and precautions for assembly provided
- Partial dismantling and level-by-level dismantling drawings provided for pump tower installation
PART DRAWING
- Drawings for part production
- Including raw material specifications, dimensions, weld thickness, weight and coating information